Jobs
Required Skills
Life Cycle Assessment
Environmental analysis
Excel
PowerPoint
French
English
Job Description Summary
En tant que nouveau leader mondial indépendant dans le secteur de l’énergie électrique, la mission et l’objectif de GE Vernova d’électrifier et de décarboniser le monde n’ont jamais été aussi clairs et prioritaires. La division PT, Power Transmission de GE VERNOVA Grid Solutions fabrique des équipements pour le réseau électrique haute tension (disjoncteurs, transformateurs de puissance…). L’évaluation et la réduction des impacts environnementaux des appareils fabriqués par PT est un sujet clé pour atteindre les objectifs de décarbonation tant en interne qu’en externe.
As a new independent global leader in the electric power industry, GE Vernova’s mission and goal to electrify and decarbonize the world has never been clearer and more of a priority. GE VERNOVA Grid Solutions Power Transmission (PT) division manufactures equipment for the high-voltage electrical network (circuit breakers, power transformers…). The assessment and reduction of environmental impacts of devices manufactured by PT is a key topic to achieve decarbonization targets both internally and externally.
Job Description
Rattaché(e) au Centre d’Excellence Matériaux et Eco-Conception, le/la stagiaire en Eco-conception et Analyse du cycle de Vie viendra épauler l’équipe éco-conception dans la réalisation d’évaluations environnementales comparatives de solutions innovantes et de propositions de pistes d’amélioration. Il/elle sera intégré dans un ou plusieurs projets de développement de nouveau produit ou de nouvelle technologie. La méthode de l’Analyse de Cycle de Vie (ACV) en suivant les normes et référentiels sectoriels applicables aux produits fabriqués par PT sera à privilégier et à appliquer, des indicateurs d’éco-conception pourront également être évalués. Il/Elle pourra également être amené à améliorer la base de données interne utilisée pour la réalisation des analyses de cycle de vie.
Principales missions
Pour chaque projet de nouveau produit ou nouvelle technologie auquel le/la stagiaire sera intégré
-
Effectuer un état des lieux des données déjà disponibles sur l’impact environnemental de la solution étudiée et celle de référence (ACV existante, bibliographie, …)
-
Réaliser l’évaluation environnementale comparative
-
Proposer des pistes de réduction des impacts environnementaux
-
Simuler les pistes
-
Améliorer les modélisations et données internes pour la réalisation des ACV
-
Restituer l’étude aux équipes et rédiger le rapport
Capacités et compétences techniques
· Connaissance de la méthodologie d’Analyse de Cycle de Vie
· L’expérience des logiciels ACV (Simapro) et de la base de données Eco Invent est un plus
· Bonne connaissance en conception de produits mécaniques et/ou électriques
· Sens du contact et de la communication.
· Maîtrise de Microsoft Excel et de PowerPoint.
· Maîtrise du français et très bon niveau d’anglais.
· Organisé, proactif, source de proposition et autonome.
· Rigoureux, pragmatique.
· Esprit de synthèse
Formations
Formation avancée BAC+5/6 spécialisée en éco-conception ou Ingénierie Génie Électrique/Mécanique/Énergie ou Matériaux soutenue par une spécialisation en éco-conception & ACV.
Localisation : Villeurbanne, Rhône (69), FR.
Durée: 6 mois - à partir de septembre 2025
Attached to the Centre of Excellence for Materials and Eco-Design, the intern in Eco-design and Life Cycle Analysis will support the ecodesign team to assess comparative environmental evaluations on innovative solutions and suggest proposals for improvement. He/she will be integrated into one or more new product or technology development projects. The Life Cycle Analysis (LCA) method following the standards and sectorial guidelines applicable to products manufactured by PT will be preferred and applied, eco-design indicators may also be evaluated. He/she may also need to improve the internal database used for life cycle analyses.
Main Missions
For each new product or technology project to which the intern will be integrated
-
Carry out an inventory of the data already available on the environmental impact of the solution studied and that of reference (existing LCA, bibliography, etc.)
-
Conduct the comparative environmental analysis
-
Propose ways to reduce environmental impacts
-
Simulate the design options
-
Improve internal modeling and data for LCA
-
Share the study with teams and write the report
Abilities, Technical Skills
· Knowledge on Life Cycle Assessment methodology
· Experience in LCA software (Simapro) and Eco Invent database is an advantage
· Good knowledge on chemistry, materials science and their characteristics
· Sense of contact and communication
· Proficient with Microsoft Excel and PowerPoint
· Fluent in French and very good level in English are necessary
· Organized, proactive, source of proposal and self-sufficient
· Rigorous, pragmatic
· Ability to synthesis
Trainings
Advanced BAC+5/6 training specialized in Eco design or Electrical / Energy/Mechanical or Material Engineering supported by a specialization in Eco design & LCA.
Location: Villeurbanne, Rhône (69), FR.
Duration: 6 months – from September 2025
Additional Information Relocation Assistance Provided: No
Total Views
0
Apply Clicks
0
Mock Applicants
0
Scraps
0
Similar Jobs

Senior Manager, Software Engineering, Missionforce
Salesforce · 2 Locations

Senior Manufacturing Engineer
Anduril · Ashville, Ohio, United States

Technical Application Expert Grid Beats
GE Vernova · Remote

Technical Support Engineer
Vectra AI · Remote, United States

Project Development Engineer - HVAC
Johnson Controls · Abu Dhabi-Abu Dhabi-United Arab Emirates
About GE Vernova
Reviews
3.8
34 reviews
Work Life Balance
3.7
Compensation
3.7
Culture
3.8
Career
3.7
Management
3.6
77%
Recommend to a Friend
Pros
Good work-life balance and flexible environment
Opportunity for career growth
Competitive compensation and benefits
Cons
Room for improvement in processes
Internal communication could improve
Some organizational bureaucracy
Salary Ranges
309 data points
Junior/L3
Junior/L3 · Business Analyst
0 reports
$92,460
total / year
Base
-
Stock
-
Bonus
-
$78,591
$106,329
Interview Experience
4 interviews
Difficulty
3.3
/ 5
Duration
14-28 weeks
Experience
Positive 0%
Neutral 50%
Negative 50%
Interview Process
1
HR Interview
2
Digital Interview
3
Technical Rounds
4
Hiring Manager Interview
News & Buzz
GE Vernova’s Q4 Was Strong—But the Backlog Number Matters More - MarketBeat
Source: MarketBeat
News
·
6w ago
Jim Cramer GE Vernova Has "Visibility on the Earnings to the 2030s" - Finviz
Source: Finviz
News
·
6w ago
GE Vernova: Priced For Perfection, It's Not Worth The Risk (NYSE:GEV) - Seeking Alpha
Source: Seeking Alpha
News
·
6w ago
GE Vernova Q4 gas turbine orders surge 74% - Utility Dive
Source: Utility Dive
News
·
6w ago